Dunston Leisure Centre, Dunston Bank, Dunston Hill, Gateshead, Tyne And Wear, NE11 9PY
Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic is a 0.18 MW solar farm project in North East. The applicant or operator on record is Gateshead Metropolitan Borough Council. Planning permission has been granted as of April 2025 and it is awaiting construction. The deterβ¦
Consented / Approved
Project stageConsented
PlanningJan 2025 (completed)
ConsentedApr 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-05-20.
Registered planning capacity; not measured generation.
Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic is a 0.18 MW solar farm project in North East. The applicant or operator on record is Gateshead Metropolitan Borough Council. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is Gateshead, reference DC/24/01084/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.180 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Gateshead Metropolitan Borough Council
Owner / operator
Gateshead Metropolitan Borough Council
Year consented
2025
Location
Dunston Leisure Centre, Dunston Bank, Dunston Hill, Gateshead, Tyne And Wear, NE11 9PY