πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Dunscombe Solar

Land a Dunscombe, Cheriton Fitzpaine, Crediton, Newton St Cyres, Devon, EX17 4JU

Dunscombe Solar is a 5 MW solar farm project in South West. The applicant or operator on record is Elgin Energy. The planning application was refused. The determining authority is Mid Devon, reference 15/01194/MFUL.…

Refused
Project stageRefused
  1. PlanningAug 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2016-09-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Dunscombe Solar is a 5 MW solar farm project in South West. The applicant or operator on record is Elgin Energy. The planning application was refused. The determining authority is Mid Devon, reference 15/01194/MFUL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperElgin Energy
Owner / operatorElgin Energy
LocationLand a Dunscombe, Cheriton Fitzpaine, Crediton, Newton St Cyres, Devon, EX17 4JU
RegionSouth West
Coordinates50.7873787Β°N, 3.6648818Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)137500

πŸ“… Project Timeline

2015-08-07