Solar Farm

Dunfermline North - Solar Photovoltaic Array/Battery storage

S/O Lochead Landfill Site, Fife, KY12 0RX

Dunfermline North - Solar Photovoltaic Array/Battery storage is a 29.9 MW solar farm project in Scotland. The applicant or operator on record is Dunfermline Solar Limited (AMPYR Solar Europe). It is recorded as under construction since July 2024. The determining authority is Fife…

Under Construction
30 MW
Installed Capacity

πŸ“‹ Project Overview

Dunfermline North - Solar Photovoltaic Array/Battery storage is a 29.9 MW solar farm project in Scotland. The applicant or operator on record is Dunfermline Solar Limited (AMPYR Solar Europe). It is recorded as under construction since July 2024. The determining authority is Fife, reference 22/01225/FULL.

Site Schematic

SUBSTATION ? ha Β· 29.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)30 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDunfermline Solar Limited (AMPYR Solar Europe)
Owner / operatorDunfermline Solar Limited (AMPYR Solar Europe)
Year consented2023
Construction started2024
LocationS/O Lochead Landfill Site, Fife, KY12 0RX
RegionScotland
Coordinates56.0996035Β°N, 3.4645955Β°W

πŸ“… Project Timeline