Duncrue Road Energy from Waste Plant

31-39 Duncrue Road Belfast, Co. Down

Duncrue Road Energy from Waste Plant is a 6.7 MW bioenergy / waste project in Northern Ireland. The applicant or operator on record is TIRU/SAUR (UK). The planning application was refused. The determining authority is Belfast, reference Z/1997/2681.…

Refused
Project stageRefused
  1. PlanningAug 1997 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2012-03-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.700 MW
Registered Capacity

πŸ“‹ Project Overview

Duncrue Road Energy from Waste Plant is a 6.7 MW bioenergy / waste project in Northern Ireland. The applicant or operator on record is TIRU/SAUR (UK). The planning application was refused. The determining authority is Belfast, reference Z/1997/2681.

πŸ”§ Technical Specifications

Capacity (MW)6.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTIRU/SAUR (UK)
Owner / operatorTIRU/SAUR (UK)
Location31-39 Duncrue Road Belfast, Co. Down
RegionNorthern Ireland
Coordinates54.5795707Β°N, 5.9219111Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

1997-08-22