Land At Double Arches Quarry, Watling Street, Heath And Reach, Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 9LD
Double Arches Solar Array is a 2.5 MW solar farm project in Eastern. The applicant or operator on record is Checkley Wood Energy. It is recorded as operational since January 2026. The determining authority is Central Bedfordshire, reference CB/20/01505/FULL.β¦
OperationalΒ· Since 2026
Project stageOperating
PlanningMay 2020 (completed)
ConsentedNov 2020 (completed)
Construction (completed)
OperatingJan 2026 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2020-09-14.
Registered planning capacity; not measured generation.
Double Arches Solar Array is a 2.5 MW solar farm project in Eastern. The applicant or operator on record is Checkley Wood Energy. It is recorded as operational since January 2026. The determining authority is Central Bedfordshire, reference CB/20/01505/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Checkley Wood Energy
Owner / operator
Checkley Wood Energy
Year consented
2020
Commissioned / target
2026
Location
Land At Double Arches Quarry, Watling Street, Heath And Reach, Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 9LD