πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Donich Water Hydro

Loch Goil, Argyll and Bute

Donich Water Hydro is a 1.4 MW conventional hydro project in Scotland. The applicant or operator on record is Gilkes Energy/Broadland Energy. It is recorded as operational since September 2016. The determining authority is Argyll and Bute, reference 2013/0120/DET.…

Operational Β· Since 2016
1 MW
Installed Capacity
2016
Commissioned

πŸ“‹ Project Overview

Donich Water Hydro is a 1.4 MW conventional hydro project in Scotland. The applicant or operator on record is Gilkes Energy/Broadland Energy. It is recorded as operational since September 2016. The determining authority is Argyll and Bute, reference 2013/0120/DET.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGilkes Energy/Broadland Energy
Owner / operatorGilkes Energy/Broadland Energy
Year consented2014
Construction started2015
Commissioned / target2016
LocationLoch Goil, Argyll and Bute
RegionScotland
Coordinates56.1726137Β°N, 4.876841Β°W

πŸ“… Project Timeline