πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Donaldson Timber, Hallam Fields Road - Solar Panels

Donaldson Timber Hallam Fields Road, Derbyshire, DE7 4AZ

Donaldson Timber, Hallam Fields Road - Solar Panels is a 0.24 MW solar farm project in East Midlands. The applicant or operator on record is SNRG. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Erewash, referenc…

Consented / Approved
Project stageConsented
  1. PlanningJan 2025 (completed)
  2. ConsentedMar 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-03-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.240 MW
Registered Capacity

πŸ“‹ Project Overview

Donaldson Timber, Hallam Fields Road - Solar Panels is a 0.24 MW solar farm project in East Midlands. The applicant or operator on record is SNRG. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Erewash, reference 0125/0005.

Site Schematic

SUBSTATION ? ha Β· 0.24 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.240 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSNRG
Owner / operatorSNRG
Year consented2025
LocationDonaldson Timber Hallam Fields Road, Derbyshire, DE7 4AZ
RegionEast Midlands
Coordinates52.9528573Β°N, 1.2936547Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-01-07
2025-03-03