Donald Baron Court, Wentworth Way, Heslington, York, North Yorkshire, YO10 5NL
Donald Baron Court, Heslington - Solar Panels is a 0.15 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is J Lister Electrical Limited. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authoβ¦
Consented / Approved
Project stageConsented
PlanningJun 2025 (completed)
ConsentedAug 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-08-22.
Registered planning capacity; not measured generation.
Donald Baron Court, Heslington - Solar Panels is a 0.15 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is J Lister Electrical Limited. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is York, reference 25/01166/SOLAR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.150 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
J Lister Electrical Limited
Owner / operator
J Lister Electrical Limited
Year consented
2025