πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Dogsthorpe South Landfill Site 2

Dogsthorpe South Landfill Site, near Peterborough, Cambridgeshire

Dogsthorpe South Landfill Site 2 is a 1.4 MW bioenergy / waste project in Eastern. The applicant or operator on record is Shanks Group. It is recorded as operational since August 2005. The determining authority is Peterborough, reference 03/00023/MMFUL.…

Operational Β· Since 2005
Project stageOperating
  1. PlanningJan 2003 (completed)
  2. ConsentedMay 2004 (completed)
  3. Construction (completed)
  4. OperatingAug 2005 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2009-07-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.400 MW
Registered Capacity
2005
Commissioned

πŸ“‹ Project Overview

Dogsthorpe South Landfill Site 2 is a 1.4 MW bioenergy / waste project in Eastern. The applicant or operator on record is Shanks Group. It is recorded as operational since August 2005. The determining authority is Peterborough, reference 03/00023/MMFUL.

πŸ”§ Technical Specifications

Capacity (MW)1.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperShanks Group
Owner / operatorShanks Group
Year consented2004
Commissioned / target2005
LocationDogsthorpe South Landfill Site, near Peterborough, Cambridgeshire
RegionEastern
Coordinates52.6019729Β°N, 0.2214423Β°W

Additional published register fields

Registered technologyLandfill Gas

πŸ“… Project Timeline

2003-01-09
2004-05-24
2005-08-01