Dogsthorpe South Landfill Site 2 is a 1.4 MW renewable energy project in Eastern. The applicant or operator on record is Shanks Group. It is recorded as operational since August 2005. The determining authority is Peterborough, reference 03/00023/MMFUL.…

Operational Β· Since 2005
1 MW
Installed Capacity
2005
Commissioned

πŸ“‹ Project Overview

Dogsthorpe South Landfill Site 2 is a 1.4 MW renewable energy project in Eastern. The applicant or operator on record is Shanks Group. It is recorded as operational since August 2005. The determining authority is Peterborough, reference 03/00023/MMFUL.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperShanks Group
Owner / operatorShanks Group
Year consented2004
Commissioned / target2005
LocationDogsthorpe South Landfill Site, near Peterborough, Cambridgeshire
RegionEastern
Coordinates52.6019729Β°N, 0.2214423Β°W