π Project Overview
Distington Materials Recycling Facility, Pittwood Road - Solar PV Panels is a solar farm project in North West. The applicant or operator on record is Cumbria Waste Management Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Cumberland, reference 2594738.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Cumbria Waste Management Limited |
| Owner / operator | Cumbria Waste Management Limited |
| Year consented | 2024 |
| Location | Distington Materials Recycling Facility Distington Waste Management Park Pittwood Road Workington, Cumbria, CA14 4JP |
| Region | North West |
| Coordinates | 54.6074467Β°N, 3.5193904Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |