Deptford Farm solar park is a 7.8 MW solar farm project in South West. The applicant or operator on record is Brilliant Harvest Installations. The planning application was refused. The determining authority is Wiltshire, reference 13/00699/FUL.…

Refused
Project stageRefused
  1. PlanningMay 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-03-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

7.800 MW
Registered Capacity

πŸ“‹ Project Overview

Deptford Farm solar park is a 7.8 MW solar farm project in South West. The applicant or operator on record is Brilliant Harvest Installations. The planning application was refused. The determining authority is Wiltshire, reference 13/00699/FUL.

Site Schematic

SUBSTATION ? ha Β· 7.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)7.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBrilliant Harvest Installations
Owner / operatorBrilliant Harvest Installations
LocationLand north of Deptford Farm Wylye Warminster Wiltshire, Wiltshire
RegionSouth West
Coordinates51.1610472Β°N, 1.9749671Β°W