Denton Hall Farm Road, Denton - Solar Photovoltaic System is a 1.16 MW solar farm project in North West. The applicant or operator on record is System 3 Limited. It is recorded as operational. The determining authority is Tameside, reference 21/01436/FUL.…

Operational
Project stageOperating
  1. PlanningJan 2022 (completed)
  2. ConsentedJul 2023 (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2022-01-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.160 MW
Registered Capacity

πŸ“‹ Project Overview

Denton Hall Farm Road, Denton - Solar Photovoltaic System is a 1.16 MW solar farm project in North West. The applicant or operator on record is System 3 Limited. It is recorded as operational. The determining authority is Tameside, reference 21/01436/FUL.

Site Schematic

SUBSTATION ? ha Β· 1.16 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.160 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSystem 3 Limited
Owner / operatorSystem 3 Limited
Year consented2023
LocationSystem 3 Limited Denton Hall Farm Road Denton, Manchester, Greater Manchester, M34 2SY
RegionNorth West
Coordinates53.4491139Β°N, 2.1335025Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)7614.6

πŸ“… Project Timeline

2022-01-11
2023-07-13