System 3 Limited Denton Hall Farm Road Denton, Manchester, Greater Manchester, M34 2SY
Denton Hall Farm Road, Denton - Solar Photovoltaic System is a 1.16 MW solar farm project in North West. The applicant or operator on record is System 3 Limited. It is recorded as operational. The determining authority is Tameside, reference 21/01436/FUL.β¦
Operational
Project stageOperating
PlanningJan 2022 (completed)
ConsentedJul 2023 (completed)
Construction (completed)
Operating (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2022-01-17.
Registered planning capacity; not measured generation.
Denton Hall Farm Road, Denton - Solar Photovoltaic System is a 1.16 MW solar farm project in North West. The applicant or operator on record is System 3 Limited. It is recorded as operational. The determining authority is Tameside, reference 21/01436/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.160 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
System 3 Limited
Owner / operator
System 3 Limited
Year consented
2023
Location
System 3 Limited Denton Hall Farm Road Denton, Manchester, Greater Manchester, M34 2SY