David Lloyd Club, The Boardwalk, Portsmouth, Hampshire, PO6 4TP
David Lloyd Club, The Boardwalk - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is David Lloyd Leisure Limited. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is β¦
Consented / Approved
Project stageConsented
PlanningJul 2023 (completed)
ConsentedOct 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-10-27.
Registered planning capacity; not measured generation.
David Lloyd Club, The Boardwalk - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is David Lloyd Leisure Limited. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Portsmouth, reference 23/00908/PN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.270 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
David Lloyd Leisure Limited
Owner / operator
David Lloyd Leisure Limited
Year consented
2023
Location
David Lloyd Club, The Boardwalk, Portsmouth, Hampshire, PO6 4TP