πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Data Centre, Dennison House, Stanhope Road - Solar Panels

Lincoln Rackhouse Data Centre, Stanhope Road, Camberley, Surrey, GU15 3BW

Data Centre, Dennison House, Stanhope Road - Solar Panels is a 1.15 MW solar farm project in South East. The applicant or operator on record is Electron Green. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is S…

Consented / Approved
Project stageConsented
  1. PlanningNov 2024 (completed)
  2. ConsentedJan 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-01-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.150 MW
Registered Capacity

πŸ“‹ Project Overview

Data Centre, Dennison House, Stanhope Road - Solar Panels is a 1.15 MW solar farm project in South East. The applicant or operator on record is Electron Green. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Surrey Heath, reference 24/0855/GPS.

Site Schematic

SUBSTATION ? ha Β· 1.15 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.150 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperElectron Green
Owner / operatorElectron Green
Year consented2025
LocationLincoln Rackhouse Data Centre, Stanhope Road, Camberley, Surrey, GU15 3BW
RegionSouth East
Coordinates51.3326665Β°N, 0.7646113Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID17227
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-11-25
2025-01-13