Lincoln Rackhouse Data Centre, Stanhope Road, Camberley, Surrey, GU15 3BW
Data Centre, Dennison House, Stanhope Road - Solar Panels is a 1.22 MW solar farm project in South East. The applicant or operator on record is Electron Green. The scheme is currently in the planning system, submitted September 2024. The determining authority is Surrey Heath, reβ¦
Revised
Project stageSuperseded by a new application
PlanningSep 2024 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2024-11-05.
Registered planning capacity; not measured generation.
Data Centre, Dennison House, Stanhope Road - Solar Panels is a 1.22 MW solar farm project in South East. The applicant or operator on record is Electron Green. The scheme is currently in the planning system, submitted September 2024. The determining authority is Surrey Heath, reference 24/0855/GPS.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.220 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Electron Green
Owner / operator
Electron Green
Location
Lincoln Rackhouse Data Centre, Stanhope Road, Camberley, Surrey, GU15 3BW