Cuttlehill Farm, Crossgates is a 25 MW battery storage project in Scotland. The applicant or operator on record is Immersa Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 18/00550/FULL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2018 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2021-10-11.
Registered planning capacity; not measured generation.
Cuttlehill Farm, Crossgates is a 25 MW battery storage project in Scotland. The applicant or operator on record is Immersa Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 18/00550/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.