Former Culmhead Airfield, Culmhead, Churchstanton, Taunton,, Somerset, TA3
Culmhead Solar Farm is a 5 MW solar farm project in South West. The applicant or operator on record is Blackdown Solar Power. The scheme is currently in the planning system, submitted April 2012. The determining authority is Somerset, reference 10/12/0009.β¦
Revised
Project stageSuperseded by a new application
PlanningApr 2012 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2013-12-10.
Registered planning capacity; not measured generation.
Culmhead Solar Farm is a 5 MW solar farm project in South West. The applicant or operator on record is Blackdown Solar Power. The scheme is currently in the planning system, submitted April 2012. The determining authority is Somerset, reference 10/12/0009.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Blackdown Solar Power
Owner / operator
Blackdown Solar Power
Location
Former Culmhead Airfield, Culmhead, Churchstanton, Taunton,, Somerset, TA3