Onshore Wind

Crow Holt Windfarm

Crow Holt Grove Retford, Nottinghamshire

Crow Holt Windfarm is a 20 MW onshore wind project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Bassetlaw, reference 24/05/00003.…

Refused
Project stageRefused
  1. PlanningMar 2005 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2007-07-31.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.000 MW
Registered Capacity

πŸ“‹ Project Overview

Crow Holt Windfarm is a 20 MW onshore wind project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Bassetlaw, reference 24/05/00003.

Site Schematic

EAST MIDLANDS Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Energy Systems (RES)
Owner / operatorRenewable Energy Systems (RES)
LocationCrow Holt Grove Retford, Nottinghamshire
RegionEast Midlands
Coordinates53.3048607Β°N, 0.8722162Β°W

Additional published register fields

Registered technologyWind Onshore
No. of Turbines10

πŸ“… Project Timeline

2005-03-31