π Project Overview
Crofton Drive - Solar Photovoltaic Panels is a 0.43 MW solar farm project in East Midlands. The applicant or operator on record is Rilmac Group Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is North Kesteven, reference 2025/0074/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Rilmac Group Limited |
| Owner / operator | Rilmac Group Limited |
| Year consented | 2025 |
| Location | 9 And 11 Crofton Drive, Lincoln, Lincolnshire, LN3 4NJ |
| Region | East Midlands |
| Coordinates | 53.233877Β°N, 0.5041924Β°W |