9 And 11 Crofton Drive, Lincoln, Lincolnshire, LN3 4NJ
Crofton Drive - Solar Photovoltaic Panels is a 0.43 MW solar farm project in East Midlands. The applicant or operator on record is Rilmac Group Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is North Kesteβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2025 (completed)
ConsentedMar 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-03-18.
Registered planning capacity; not measured generation.
Crofton Drive - Solar Photovoltaic Panels is a 0.43 MW solar farm project in East Midlands. The applicant or operator on record is Rilmac Group Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is North Kesteven, reference 2025/0074/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.430 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Rilmac Group Limited
Owner / operator
Rilmac Group Limited
Year consented
2025