Croft Farm, Askern Road - Solar Array & Hydrogen Plant is a 2.5 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is CF Estates (Yorkshire) Limited. It is recorded as under construction. The determining authority is Doncaster, reference 22/02088/F…

Under Construction
Project stageUnder construction
  1. PlanningSep 2022 (completed)
  2. ConsentedMay 2023 (completed)
  3. Construction (current stage)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Under Construction.

Official register: July 2026

Recorded status: Under Construction. Source record updated 2026-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.500 MW
Registered Capacity

πŸ“‹ Project Overview

Croft Farm, Askern Road - Solar Array & Hydrogen Plant is a 2.5 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is CF Estates (Yorkshire) Limited. It is recorded as under construction. The determining authority is Doncaster, reference 22/02088/FULM.

Site Schematic

SUBSTATION ? ha Β· 2.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCF Estates (Yorkshire) Limited
Owner / operatorCF Estates (Yorkshire) Limited
Year consented2023
LocationCroft Farm Askern Road Carcroft, South Yorkshire, DN6 8DE
RegionYorkshire and Humber
Coordinates53.5812365Β°N, 1.1765285Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID12508
Mounting Type for SolarGround
Solar Site Area (sqm)206812

πŸ“… Project Timeline

2022-09-13