Land South Of Sheepcote Wood B, Witham Road, Cressing, Braintree, Essex, Essex, CM77 8NZ
Cressing Solar Farm (Phase 2) is a 18 MW solar farm project in Eastern. The applicant or operator on record is Octopus Investments. The application has been withdrawn or the scheme abandoned. The determining authority is Braintree, reference 15/00949/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedNov 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2018-08-21.
Registered planning capacity; not measured generation.
Cressing Solar Farm (Phase 2) is a 18 MW solar farm project in Eastern. The applicant or operator on record is Octopus Investments. The application has been withdrawn or the scheme abandoned. The determining authority is Braintree, reference 15/00949/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Octopus Investments
Owner / operator
Octopus Investments
Year consented
2015
Location