Solar Farm

Craig y Perthi Solar Farm

Btw M4 and the Railway, Near Llanwern, Underwood & Bishston, Newport, Gwent, NP18 2EA

Craig y Perthi Solar Farm is a 99.9 MW solar farm project in Wales. The applicant or operator on record is JBM Solar Projects Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3279787.…

Refused
Project stageRefused
  1. PlanningApr 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-01-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

99.900 MW
Registered Capacity

πŸ“‹ Project Overview

Craig y Perthi Solar Farm is a 99.9 MW solar farm project in Wales. The applicant or operator on record is JBM Solar Projects Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference DNS/3279787.

Site Schematic

SUBSTATION ? ha Β· 99.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)99.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperJBM Solar Projects Limited
Owner / operatorJBM Solar Projects Limited
LocationBtw M4 and the Railway, Near Llanwern, Underwood & Bishston, Newport, Gwent, NP18 2EA
RegionWales
Coordinates51.5848296Β°N, 2.8854799Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID12998
Mounting Type for SolarGround
Solar Site Area (sqm)2400000

πŸ“… Project Timeline

2024-04-11