Craig Nab Wind Energy Hub - Wind Farm

14km E/O Craig Nab Wind Energy Hub, Stranraer, Dumfries and Galloway, DG9

Craig Nab Wind Energy Hub - Wind Farm is a 3.8 MW battery storage project in Scotland. The applicant or operator on record is Belltown Power Limited. The scheme is currently in the planning system, submitted December 2024. The determining authority is Dumfries and Galloway, refer…

In Planning
4 MW
Power Capacity

πŸ“‹ Project Overview

Craig Nab Wind Energy Hub - Wind Farm is a 3.8 MW battery storage project in Scotland. The applicant or operator on record is Belltown Power Limited. The scheme is currently in the planning system, submitted December 2024. The determining authority is Dumfries and Galloway, reference 24/2545/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4 MW
Battery chemistryCo-located with RE

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBelltown Power Limited
Owner / operatorBelltown Power Limited
Location14km E/O Craig Nab Wind Energy Hub, Stranraer, Dumfries and Galloway, DG9
RegionScotland
Coordinates54.903641Β°N, 5.0275822Β°W

πŸ“… Project Timeline