Court Farm (Frome) is a 6.8 MW solar farm project in South West. The applicant or operator on record is Sunsave 24 (West Woodlands) Limited. The planning application was refused. The determining authority is Somerset, reference 2014/0852/FUL.…

Refused
Project stageRefused
  1. PlanningMay 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2014-09-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.800 MW
Registered Capacity

πŸ“‹ Project Overview

Court Farm (Frome) is a 6.8 MW solar farm project in South West. The applicant or operator on record is Sunsave 24 (West Woodlands) Limited. The planning application was refused. The determining authority is Somerset, reference 2014/0852/FUL.

Site Schematic

SUBSTATION ? ha Β· 6.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSunsave 24 (West Woodlands) Limited
Owner / operatorSunsave 24 (West Woodlands) Limited
LocationFarm West Woodlands, Frome, Somerset, BA11 5EN
RegionSouth West
Coordinates51.1948392Β°N, 2.3184226Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)98800

πŸ“… Project Timeline

2014-05-08