Corporation Farm is a 5 MW solar farm project in Eastern. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Maldon, reference 15/00779/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedApr 2017 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2019-03-01.
Registered planning capacity; not measured generation.
Corporation Farm is a 5 MW solar farm project in Eastern. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Maldon, reference 15/00779/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.