Corner Copse Solar Farm, Stanton Fitzwarren, Swindon,, Wiltshire, SN6
Corner Copse Solar Farm is a 49.9 MW solar farm project in South West. The applicant or operator on record is BayWa r.e. UK Limited. It is recorded as under construction since April 2024. The determining authority is Swindon, reference S/19/1097.β¦
Under Construction
Project stageUnder construction
PlanningJul 2019 (completed)
ConsentedJun 2020 (completed)
ConstructionApr 2024 (current stage)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Under Construction.
Official register: July 2026
Recorded status: Under Construction. Source record updated 2025-05-12.
Registered planning capacity; not measured generation.
Corner Copse Solar Farm is a 49.9 MW solar farm project in South West. The applicant or operator on record is BayWa r.e. UK Limited. It is recorded as under construction since April 2024. The determining authority is Swindon, reference S/19/1097.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
BayWa r.e. UK Limited
Owner / operator
BayWa r.e. UK Limited
Year consented
2020
Construction started
2024
Location
Corner Copse Solar Farm, Stanton Fitzwarren, Swindon,, Wiltshire, SN6