Copley Farm is a 10.1 MW solar farm project in East Midlands. The applicant or operator on record is TGC Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Kesteven, reference S14/2290.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2014 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedDec 2014 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2016-01-26.
Registered planning capacity; not measured generation.
Copley Farm is a 10.1 MW solar farm project in East Midlands. The applicant or operator on record is TGC Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Kesteven, reference S14/2290.