π Project Overview
CooperVision, Ensign Way - Solar Panels is a 1.37 MW solar farm project in South East. The applicant or operator on record is Ylem Energy Limited. Planning permission has been granted as of September 2024 and it is awaiting construction. The determining authority is Eastleigh, reference PN/24/97950.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Ylem Energy Limited |
| Owner / operator | Ylem Energy Limited |
| Year consented | 2024 |
| Location | Cooper Vision, South Point 3 And 4, Ensign Way, Southampton, Hampshire, SO31 4RF |
| Region | South East |
| Coordinates | 50.8578313Β°N, 1.3262448Β°W |