πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Convatec Green Manufacturing Hub

Unit 1 - 2 Heads Of The Valleys Industrial Estate, Rhymney, Tredegar, Gwent, NP22 5RL

Convatec Green Manufacturing Hub is a 15 MW onshore wind project in Wales. The applicant or operator on record is Convatec Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference CAS-02977-Y9F1W7.…

Refused
Project stageRefused
  1. PlanningApr 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-01-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

15.000 MW
Registered Capacity

πŸ“‹ Project Overview

Convatec Green Manufacturing Hub is a 15 MW onshore wind project in Wales. The applicant or operator on record is Convatec Limited. The planning application was refused. The determining authority is Welsh Government (NSIP), reference CAS-02977-Y9F1W7.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)15.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperConvatec Limited
Owner / operatorConvatec Limited
LocationUnit 1 - 2 Heads Of The Valleys Industrial Estate, Rhymney, Tredegar, Gwent, NP22 5RL
RegionWales
Coordinates51.7627158Β°N, 3.2954079Β°W

Additional published register fields

Registered technologyWind Onshore
Storage Co-location REPD Ref ID15555
Turbine Capacity (MW)5
No. of Turbines3
Height of Turbines (m)150

πŸ“… Project Timeline

2025-04-03