Solar Farm

Continental Approach - Solar Panels

Roe Limited Unit W1 - W3 Continental Approach MARGATE, Kent, CT9 4JP

Continental Approach - Solar Panels is a 0.2 MW solar farm project in South East. The applicant or operator on record is Roe Timber Frame Limited. It is recorded as operational since August 2021. The determining authority is Thanet, reference CD/TH/21/0785.…

Operational Β· Since 2021
Project stageOperating
  1. PlanningJun 2021 (completed)
  2. ConsentedNov 2021 (completed)
  3. Construction (completed)
  4. OperatingAug 2021 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2021-11-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity
2021
Commissioned

πŸ“‹ Project Overview

Continental Approach - Solar Panels is a 0.2 MW solar farm project in South East. The applicant or operator on record is Roe Timber Frame Limited. It is recorded as operational since August 2021. The determining authority is Thanet, reference CD/TH/21/0785.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRoe Timber Frame Limited
Owner / operatorRoe Timber Frame Limited
Year consented2021
Commissioned / target2021
LocationRoe Limited Unit W1 - W3 Continental Approach MARGATE, Kent, CT9 4JP
RegionSouth East
Coordinates51.3674684Β°N, 1.3883579Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2021-06-04
2021-11-04
2021-08-01