Solar Farm

Concorde Way, Segensworth - Solar Panels

Turbomeca UK Concorde Way Segensworth Fareham, Hampshire, PO15 5RL

Concorde Way, Segensworth - Solar Panels is a 1.04 MW solar farm project in South East. The applicant or operator on record is Solar Advanced Systems T/A SAS Energy. It is recorded as under construction since March 2023. The determining authority is Winchester, reference 22/01583…

Under Construction
Project stageUnder construction
  1. PlanningJul 2022 (completed)
  2. ConsentedNov 2022 (completed)
  3. ConstructionMar 2023 (current stage)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Under Construction.

Official register: July 2026

Recorded status: Under Construction. Source record updated 2022-07-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.040 MW
Registered Capacity

πŸ“‹ Project Overview

Concorde Way, Segensworth - Solar Panels is a 1.04 MW solar farm project in South East. The applicant or operator on record is Solar Advanced Systems T/A SAS Energy. It is recorded as under construction since March 2023. The determining authority is Winchester, reference 22/01583/PNSOL.

Site Schematic

SUBSTATION ? ha Β· 1.04 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.040 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Advanced Systems T/A SAS Energy
Owner / operatorSolar Advanced Systems T/A SAS Energy
Year consented2022
Construction started2023
LocationTurbomeca UK Concorde Way Segensworth Fareham, Hampshire, PO15 5RL
RegionSouth East
Coordinates50.8711075Β°N, 1.248671Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-07-19
2022-11-30
2023-03-16