πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Colleen Farm

Colleen Farm, Blackawton, Totnes,, Devon, TQ9 7DW

Colleen Farm is a 2.2 MW solar farm project in South West. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 22/1610/14/F.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-10-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.200 MW
Registered Capacity

πŸ“‹ Project Overview

Colleen Farm is a 2.2 MW solar farm project in South West. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 22/1610/14/F.

Site Schematic

SUBSTATION ? ha Β· 2.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBowler Energy
Owner / operatorBowler Energy
Year consented2015
LocationColleen Farm, Blackawton, Totnes,, Devon, TQ9 7DW
RegionSouth West
Coordinates50.3634291Β°N, 3.6922218Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)48000

πŸ“… Project Timeline

2014-06-25
2015-03-26