Colleen Farm is a 2.2 MW solar farm project in South West. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 22/1610/14/F.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2014 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedMar 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2016-10-25.
Registered planning capacity; not measured generation.
Colleen Farm is a 2.2 MW solar farm project in South West. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 22/1610/14/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.