π Project Overview
Coal Road, Whinmoor - Solar Panels is a 1.6 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Unilever UK (Leeds). Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is Leeds, reference 25/03574/DPD.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1.600 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Unilever UK (Leeds) |
| Owner / operator | Unilever UK (Leeds) |
| Year consented | 2025 |
| Location | 96 Coal Road, Whinmoor, Leeds, West Yorkshire, LS14 2AR |
| Region | Yorkshire and Humber |
| Coordinates | 53.8302282Β°N, 1.4568107Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |