Land Between M4 And Channel View, Castleton, Cardiff, Gwent
Coal Pit Lane is a 5.3 MW solar farm project in Wales. The applicant or operator on record is Phoenix Capital R-Energy Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Newport, reference 14/0531.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2014 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2014-11-23.
Registered planning capacity; not measured generation.
Coal Pit Lane is a 5.3 MW solar farm project in Wales. The applicant or operator on record is Phoenix Capital R-Energy Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Newport, reference 14/0531.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Phoenix Capital R-Energy Ltd
Owner / operator
Phoenix Capital R-Energy Ltd
Location
Land Between M4 And Channel View, Castleton, Cardiff, Gwent