Cloverlay Industrial Park, Canterbury Lane, Rainham, Gillingham, Kent, ME8 8GL
Cloverlay Industrial Park, Canterbury Lane - Micro Energy Storage System is a 0.2 MW battery storage project in South East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Medway, rβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2026-04-10.
Registered planning capacity; not measured generation.
Cloverlay Industrial Park, Canterbury Lane - Micro Energy Storage System is a 0.2 MW battery storage project in South East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Medway, reference MC/25/2400.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Location
Cloverlay Industrial Park, Canterbury Lane, Rainham, Gillingham, Kent, ME8 8GL