Clepington Road Electric Vehicle Charging Hub is a 0.6 MW battery storage project in Scotland. The applicant or operator on record is Dundee City Council. The application has been withdrawn or the scheme abandoned. The determining authority is Dundee City, reference 21/00793/FULLβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningNov 2021 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2022-01-04.
Registered planning capacity; not measured generation.
Clepington Road Electric Vehicle Charging Hub is a 0.6 MW battery storage project in Scotland. The applicant or operator on record is Dundee City Council. The application has been withdrawn or the scheme abandoned. The determining authority is Dundee City, reference 21/00793/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.