πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Clay Tye Road - Solar Farm

E/O Claytye Road, Warley Sub-Station, Clay Tye Road, Upminster, Essex, RM14

Clay Tye Road - Solar Farm is a 49.9 MW solar farm project in London. The applicant or operator on record is REG Windpower Limited. The scheme is currently in the planning system, submitted April 2021. The determining authority is Havering, reference P0814.21.…

In Planning
Project stageIn planning
  1. PlanningApr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2021-05-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Clay Tye Road - Solar Farm is a 49.9 MW solar farm project in London. The applicant or operator on record is REG Windpower Limited. The scheme is currently in the planning system, submitted April 2021. The determining authority is Havering, reference P0814.21.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperREG Windpower Limited
Owner / operatorREG Windpower Limited
LocationE/O Claytye Road, Warley Sub-Station, Clay Tye Road, Upminster, Essex, RM14
RegionLondon
Coordinates51.5407905Β°N, 0.3222467Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)79600

πŸ“… Project Timeline

2021-04-27