Clay Cross CHP is a 8 MW bioenergy / waste project in East Midlands. The applicant or operator on record is REACT Energy (Kedco). The application has been withdrawn or the scheme abandoned. The determining authority is North East Derbyshire, reference CW4/1114/98.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-11-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity

πŸ“‹ Project Overview

Clay Cross CHP is a 8 MW bioenergy / waste project in East Midlands. The applicant or operator on record is REACT Energy (Kedco). The application has been withdrawn or the scheme abandoned. The determining authority is North East Derbyshire, reference CW4/1114/98.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperREACT Energy (Kedco)
Owner / operatorREACT Energy (Kedco)
Year consented2016
LocationBridge Street, Clay Cross, Derbyshire
RegionEast Midlands
Coordinates53.1723282Β°N, 1.4107265Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2014-12-17
2016-04-11