Land To The East Of Meall Na Speireig Clach Liath Evanton Ross-shire, Highland
Clach Liath Wind Farm is a 42.5 MW onshore wind project in Scotland. The applicant or operator on record is Falck Renewables Wind Ltd. The planning application was refused. The determining authority is Highland, reference 12/01689/FUL.β¦
Refused
Project stageRefused
PlanningApr 2012 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2013-02-26.
Registered planning capacity; not measured generation.
Clach Liath Wind Farm is a 42.5 MW onshore wind project in Scotland. The applicant or operator on record is Falck Renewables Wind Ltd. The planning application was refused. The determining authority is Highland, reference 12/01689/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
42.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Falck Renewables Wind Ltd
Owner / operator
Falck Renewables Wind Ltd
Location
Land To The East Of Meall Na Speireig Clach Liath Evanton Ross-shire, Highland