π Project Overview
Circular 13, Unit B, Gascoigne Road - Solar Panels is a 0.98 MW solar farm project in London. The applicant or operator on record is Mirastar. Planning permission has been granted as of June 2023 and it is awaiting construction. The determining authority is Barking and Dagenham, reference 23/00624/PRIPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.980 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Mirastar |
| Owner / operator | Mirastar |
| Year consented | 2023 |
| Location | Unit B, Circular 13 Gascoigne Road, London, IG11 7HP |
| Region | London |
| Coordinates | 51.5286084Β°N, 0.0821073Β°E |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Storage Co-location REPD Ref ID | |
| CfD Capacity (MW) | |
| Turbine Capacity (MW) | |
| No. of Turbines | |
| Height of Turbines (m) | |
| Mounting Type for Solar | Roof |
| Solar Site Area (sqm) |