Cilciffeth 'A' Wind Farm is a 7.8 MW onshore wind project in Wales. The applicant or operator on record is South Wales Power / SWALEC / National Windpower. The planning application was refused. The determining authority is Pembrokeshire.β¦
Refused
Project stageRefused
PlanningFeb 1999 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2005-04-14.
Registered planning capacity; not measured generation.
Cilciffeth 'A' Wind Farm is a 7.8 MW onshore wind project in Wales. The applicant or operator on record is South Wales Power / SWALEC / National Windpower. The planning application was refused. The determining authority is Pembrokeshire.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.