Christchurch Road, Downton - Battery Storage is a 0.2 MW battery storage project in South East. The applicant or operator on record is GridSource Limited. The planning application was refused. The determining authority is New Forest, reference 24/10748.β¦
Refused
Project stageRefused
PlanningAug 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2024-10-28.
Registered planning capacity; not measured generation.
Christchurch Road, Downton - Battery Storage is a 0.2 MW battery storage project in South East. The applicant or operator on record is GridSource Limited. The planning application was refused. The determining authority is New Forest, reference 24/10748.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.