Land at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire
Chittering Solar Farm Extension is a 6.3 MW solar farm project in Eastern. The applicant or operator on record is Abbey Properties Cambs. It is recorded as operational since March 2013. The determining authority is South Cambridgeshire, reference S/1542/12/FL.β¦
OperationalΒ· Since 2013
Project stageOperating
PlanningJul 2012 (completed)
ConsentedOct 2012 (completed)
ConstructionJan 2013 (completed)
OperatingMar 2013 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2013-04-12.
Registered planning capacity; not measured generation.
Chittering Solar Farm Extension is a 6.3 MW solar farm project in Eastern. The applicant or operator on record is Abbey Properties Cambs. It is recorded as operational since March 2013. The determining authority is South Cambridgeshire, reference S/1542/12/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Abbey Properties Cambs
Owner / operator
Abbey Properties Cambs
Year consented
2012
Construction started
2013
Commissioned / target
2013
Location
Land at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire