π Project Overview
Chittering Solar Farm Extension is a 6.3 MW solar farm project in Eastern. The applicant or operator on record is Abbey Properties Cambs. It is recorded as operational since March 2013. The determining authority is South Cambridgeshire, reference S/1542/12/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 6 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Abbey Properties Cambs |
| Owner / operator | Abbey Properties Cambs |
| Year consented | 2012 |
| Construction started | 2013 |
| Commissioned / target | 2013 |
| Location | Land at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire |
| Region | Eastern |
| Coordinates | 52.3151997Β°N, 0.2176615Β°E |