πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Chittering Solar Farm Extension

Land at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire

Chittering Solar Farm Extension is a 6.3 MW solar farm project in Eastern. The applicant or operator on record is Abbey Properties Cambs. It is recorded as operational since March 2013. The determining authority is South Cambridgeshire, reference S/1542/12/FL.…

Operational Β· Since 2013
6 MW
Installed Capacity
2013
Commissioned

πŸ“‹ Project Overview

Chittering Solar Farm Extension is a 6.3 MW solar farm project in Eastern. The applicant or operator on record is Abbey Properties Cambs. It is recorded as operational since March 2013. The determining authority is South Cambridgeshire, reference S/1542/12/FL.

Site Schematic

SUBSTATION ? ha Β· 6.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAbbey Properties Cambs
Owner / operatorAbbey Properties Cambs
Year consented2012
Construction started2013
Commissioned / target2013
LocationLand at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire
RegionEastern
Coordinates52.3151997Β°N, 0.2176615Β°E

πŸ“… Project Timeline