Land off Carpenters Down, Basingstoke, Hampshire, RG24 9PJ
Chineham Battery Energy Storage Facility is a 15 MW battery storage project in South East. The applicant or operator on record is Camborne Energy Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Basingstoke and Deane, reference 16/β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2016 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2018-11-23.
Registered planning capacity; not measured generation.
Chineham Battery Energy Storage Facility is a 15 MW battery storage project in South East. The applicant or operator on record is Camborne Energy Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Basingstoke and Deane, reference 16/02534/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
15.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Camborne Energy Storage
Owner / operator
Camborne Energy Storage
Location
Land off Carpenters Down, Basingstoke, Hampshire, RG24 9PJ