Chilton Bros Biomass Plant is a 2.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Land Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Ayrshire, reference 10/01397/APP.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2012-07-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.500 MW
Registered Capacity

πŸ“‹ Project Overview

Chilton Bros Biomass Plant is a 2.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Land Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Ayrshire, reference 10/01397/APP.

πŸ”§ Technical Specifications

Capacity (MW)2.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLand Energy Limited
Owner / operatorLand Energy Limited
Location19 Ladywell Avenue Girvan, Strathclyde, KA26 9PF
RegionScotland
Coordinates55.2629263Β°N, 4.8355446Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2010-09-18