πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Chemring Countermeasures Limited, Netton - Solar Panels

Chemring Countermeasures Ltd, Netton, Wiltshire, SP4 6AS

Chemring Countermeasures Limited, Netton - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Chemring Countermeasures. The planning application was refused. The determining authority is Wiltshire, reference PL/2025/09805.…

Refused
Project stageRefused
  1. PlanningDec 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-03-31.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.250 MW
Registered Capacity

πŸ“‹ Project Overview

Chemring Countermeasures Limited, Netton - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Chemring Countermeasures. The planning application was refused. The determining authority is Wiltshire, reference PL/2025/09805.

Site Schematic

SUBSTATION ? ha Β· 0.25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.250 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperChemring Countermeasures
Owner / operatorChemring Countermeasures
LocationChemring Countermeasures Ltd, Netton, Wiltshire, SP4 6AS
RegionSouth West
Coordinates51.1303731Β°N, 1.796948Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-12-24