πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Chelveston Renewable Energy Park (Waste AD)

Wellingborough,, Northamptonshire, NN9 6AU

Chelveston Renewable Energy Park (Waste AD) is a 2 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Chelveston Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, r…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2014-05-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Chelveston Renewable Energy Park (Waste AD) is a 2 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Chelveston Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 08/00194/NCC.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperChelveston Renewable Energy
Owner / operatorChelveston Renewable Energy
Year consented2008
LocationWellingborough,, Northamptonshire, NN9 6AU
RegionEast Midlands
Coordinates52.3014415Β°N, 0.5413545Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2008-01-29
2008-05-13