Chelker Reservoir Repower is a 3.9 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is Kelda Water Services. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 24/2011/11383.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2011 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-12-16.
Registered planning capacity; not measured generation.
Chelker Reservoir Repower is a 3.9 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is Kelda Water Services. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 24/2011/11383.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Kelda Water Services
Owner / operator
Kelda Water Services
Location
Skipton Road, Addingham, Ilkley, LS29 0JU, North Yorkshire