πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Cheddleton Industrial Estate

John Pointon and Sons, Felthouse Lane, Cheddleton, Leek, Staffordshire, Staffordshire, ST13 7BT

Cheddleton Industrial Estate is a 6.5 MW bioenergy / waste project in West Midlands. The applicant or operator on record is J Pointon & Sons Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Staffordshire Moorlands, reference SM.17/02/1…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-12-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.500 MW
Registered Capacity

πŸ“‹ Project Overview

Cheddleton Industrial Estate is a 6.5 MW bioenergy / waste project in West Midlands. The applicant or operator on record is J Pointon & Sons Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Staffordshire Moorlands, reference SM.17/02/1138 W.

πŸ”§ Technical Specifications

Capacity (MW)6.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperJ Pointon & Sons Ltd
Owner / operatorJ Pointon & Sons Ltd
LocationJohn Pointon and Sons, Felthouse Lane, Cheddleton, Leek, Staffordshire, Staffordshire, ST13 7BT
RegionWest Midlands
Coordinates53.0523357Β°N, 2.0416113Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2017-04-04