Charrington Bowl, Kingston Road - Solar Panels is a 0.28 MW solar farm project in London. The applicant or operator on record is Mayfair Capital Property Unit Trust. The planning application was refused. The determining authority is Kingston upon Thames, reference 22/02516/PRA.β¦
Refused
Project stageRefused
PlanningSep 2022 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2022-11-01.
Registered planning capacity; not measured generation.
Charrington Bowl, Kingston Road - Solar Panels is a 0.28 MW solar farm project in London. The applicant or operator on record is Mayfair Capital Property Unit Trust. The planning application was refused. The determining authority is Kingston upon Thames, reference 22/02516/PRA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.