πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Charrington Bowl, Kingston Road - Solar Panels

Charrington Bowl Kingston Road Tolworth, Surrey, KT5 9PB

Charrington Bowl, Kingston Road - Solar Panels is a 0.28 MW solar farm project in London. The applicant or operator on record is Mayfair Capital Property Unit Trust. The planning application was refused. The determining authority is Kingston upon Thames, reference 22/02516/PRA.…

Refused
Project stageRefused
  1. PlanningSep 2022 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2022-11-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.280 MW
Registered Capacity

πŸ“‹ Project Overview

Charrington Bowl, Kingston Road - Solar Panels is a 0.28 MW solar farm project in London. The applicant or operator on record is Mayfair Capital Property Unit Trust. The planning application was refused. The determining authority is Kingston upon Thames, reference 22/02516/PRA.

Site Schematic

SUBSTATION ? ha Β· 0.28 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.280 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMayfair Capital Property Unit Trust
Owner / operatorMayfair Capital Property Unit Trust
LocationCharrington Bowl Kingston Road Tolworth, Surrey, KT5 9PB
RegionLondon
Coordinates51.3779432Β°N, 0.2804553Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-09-27